dodument Article

Read Article about Microturbines

Microturbines spin
- up new energy savings

Incineration Plant - EKOTERMEX, Pustiměř

Instalation parameters

Incineration Plant - EKOTERMEX, Pustiměř
Input steam pressure max. [MPa] 1.25 - 1.3
Input temperature of steam max. [°C] 220 - 250
Output steam pressure max. [MPa] 0.05
Generator output max. [kW] 78

Instalation description

The steam control valves regulate the amount of steam entering the steam turbine. The payback period of low pressure steam turbine TR HI 150 in Incineration Plant EKOTERMEX, Pustiměř (Czech Republic) was 1.8 years. The initial investment was 106 877$.