Biomass Power Plant - ZOO Olomouc

Instalation parameters

Biomass Power Plant - ZOO Olomouc
Input steam pressure max. [MPa] 1,4
Input temperature of steam max. [°C] 220
Output steam pressure max. [MPa] 0,03
Generator output max. [kW] 32

Instalation description

We supplied very efficient steam turbine TR HI 150 for steam reduction to Biomass power plant in ZOO Olomouc in the Czech Republic. The initial investment was 75 539$ and the payback period of steam turbines was 3.7 years. 

 